Ámbito de Trabajo:
AIS Infrastructure performed stabilization and closure activities for a fly ash and liquefied cellulose disposal pond at one of the world’s largest tissue manufacturing facilities. The project involved challenging environmental conditions, extensive dewatering operations, and innovative stabilization methods for hazardous waste materials.
Detalles:
© 2026 All Rights Reserved. AIS Infrastructure, 2030 Hamilton Place Blvd, Suite 200, Chattanooga, TN 37421. Política De Privacidad.