Scope of Work:
AIS Infrastructure delivered a large-scale design-build Joint Processing Center for DHS/CBP, constructing a secure, mission-critical facility with integrated architectural, structural, and MEP systems. The project included major earthwork, road and utility installation, stormwater management, and construction of an approximately 300,000-square-foot high-security facility.
Details:
© 2026 All Rights Reserved. AIS Infrastructure, 2030 Hamilton Place Blvd, Suite 200, Chattanooga, TN 37421. Privacy Policy.